My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65220
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:04 PM
Creation date
11/20/2007 8:46:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003019
IBM Index Class Name
Permit File
Doc Date
3/5/2003
Doc Name
Permit Application
From
Baca County
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPE SPRINGS RANCH PIT # 18 <br />LLC <br />Ext~.ibit D <br />RECLAMATION PLAN: <br />ESTIMATED COST TO RECLAIM THE MINING SITE: <br />Backfilling: <br />1- Loader 12 hours $60.00 per hour <br />1- Dozer 12 hours $60.00 per hour <br />2- Men 12 hours $12.67 per hour <br />3- Trucks 12 hours $35.00 per hour <br />3- Men 12 hours $12.67 per hour <br />TOPSOIL APPLICATION: <br />=$720.00 <br />$720.00 <br />$ 304.08 <br />$1260.00 <br />$456.10 <br />1- Loader 10 hours $60.00 per hour $600.00 <br />1- Man 10 hours . .7,$'12:67 per hour $126.70 <br />SEEDING: <br />1- Tractor/ Grassdrill 4houre $25.00 per hour $100.00 <br />1- Man 4hours $12.67 per hour $50.68 <br />MULCHING: <br />~- Trucks 10 hours $35.00 per hour $700.00 <br />1- Loader 10 hours $60.00 per hour $600.00 <br />3- Men 10 hours $12.67 per hour $380.10 <br />MOVING EQUIPMENT FROM THE TOWN OF PRITCHETT <br />1- Semi and Low boy Trailer 2.5 hours $35.00 per hour $87.50 <br />1- Man 2.5 hours $12.67 per hour $31.60 <br />1- Loader to site .25 hours $60.00 per hour $15.00 <br />1- Dozer to site .25 hours $60.00 per hour $15.00 <br />1- Loader to top soilsite 1.50 hours $60.00 per hour $90.00 <br />GRASS SEED: <br />$250.00 <br />Total: $6506.86 <br />15.8% $1028.08 <br />Total: $7534.94 <br />No temporary seeding will be done. The topsoil will be stockpiled <br />for reclaiming purposes slopes will 3:1 and re-seeded to native <br />grass. <br />
The URL can be used to link to this page
Your browser does not support the video tag.