My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27975
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:18 PM
Creation date
11/20/2007 8:43:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Hydrology
Doc Date
6/27/2005
Doc Name
substitute water supply plan
From
office of the state engineer
To
dmg
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Donald E. Frick Page 3 <br />June 21, 2005 <br />9. The name, address, and phone number of a contact person who will be responsible for <br />the operation and accounting of this plan must be provided to the water commissioner <br />and the division engineer. <br />10. This plan may be revoked or modified at any time should it be determined that injury to <br />other vested water rights has or will occur as a result of the operation of this plan. <br />11. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all use of ground water must cease <br />immediately. <br />1z. In accordance with amendments to §25-8-202(7), C.R.S., and Senate Bill 89-181 Rules <br />and Regulations adopted on February 4, 1992, the State Engineer shall determine if the <br />substitute supply is of a quality to meet requirements of use to which the senior <br />appropriation receiving the substituted supply has normally been put. As such, water <br />quality data or analyses may be requested at any time to determine if the requirements <br />of use of the senior appropriator are met. <br />13. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />water court case or any other legal action that may be initiated concerning the substitute <br />water supply plan. This decision shall not bind the State Engineer to act in a similar <br />manner in any other applications involving other plans or in any proposed renewal of this <br />plan, and shall not imply concurrence with any findings of fact or conclusions of law <br />contained herein, or with the engineering methodologies used by the Applicant. <br />Should you have any questions, please contact Joanna Williams of this office or Mr. <br />Scott Cuthbertson of our Division office in Greeley at (970) 352-0742. <br />Sincerely, <br /> <br />Kevin G. Rein <br />Water Resource Engineer <br />Attachments: Glover Analysis Table and Input Stream Depletion Analysis Using Stream <br />Depletion Factors Table <br />KGR/JMW <br />cc: Scott Cuthbertson, Assistant Division Engineer <br />Robert Stahl, Water Commissioner District 2 <br />DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.