Laserfiche WebLink
Donald E. Frick <br />June 21, 2005 <br />Page 2 <br />This plan shall be valid through December 31, 2005, unless otherwise revoked or <br />modified. Should a renewal of this plan be needed, a request to renew the plan and <br />statutory fee (currently $217) must be submitted to this by November 1, 2005. <br />2. Anew well permit must be obtained for the proposed uses and exposed pond surface area <br />of the gravel pit, prior to expanding the uses and exposed surface area at the site. The <br />provisions of Colorado Revised Statute 37-90-137(2) prohibits the issuance of a permit for <br />a well to be located within 600 feet of any existing well, unless the State Engineer finds that <br />circumstances so warrant after a hearing held in accordance with the procedural rules in <br />2CCR402-5. This hearing may be waived 'rf you are able to obtain statements from the <br />owners of ali wells within 600 feet, verifying that they have no objection to your use of the <br />proposed well. Should a new well permit be denied for reasons of 600 foot spacing, or any <br />other legitimate reason, approval of this substitute supply plan will be canceled. <br />3. The total area of pond surface exposed and the total amount of water to be consumed <br />due to water removed in product cannot exceed that amount listed on the attached <br />tables for each month. Should the actual values exceed the amounts in the tables, an <br />amendment will need to be filed with this office. <br />4. The Water Commissioner responsible for the administration of this plan is Mr. Robert <br />Stahl, 9378 WCR 25, Fort Lupton, CO 80621, phone no. (303) 857-0742. The applicant <br />shall maintain daily records of all diversions, replacements, and the amount of water <br />used for each particular purpose. The applicant shall provide a report of these records to <br />the Division Engineer and the Water Commissioner on a monthly basis on a form <br />approved by them. The accounting must be submitted within five (5) calendar days of <br />the end of the month for which the accounting is being made. As part of the monthly <br />accounting prepared by the operator, the location of the discharge points from each <br />dewatering trench must be located on a map and submitted with the accounting. <br />5. All releases of replacement water must be sufficient to cover all out of priority depletions <br />and be made under the direction and/or approval of the Water Commissioner. The <br />replacement may be aggregated to maximize beneficial use. The Water Commissioner <br />and/or Division Engineer shall determine the rate and timing of an aggregated release. <br />6. The replacement water, which is the subject of this plan cannot be sold or leased to any <br />other entify. As a condition of subsequent renewals of Phis subsfifufe wafer supply plan, <br />the replacement water must be appurtenant to this site until a plan for augmentation is <br />obtained. <br />7. Approval of this plan is for the purposes as stated herein. This office must first approve <br />any additional uses for which the water may be used. <br />8. The approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a permanent <br />plan for augmentation or mitigation to ensure the permanent replacement of all <br />depletions, including long-term evaporation losses and lagged depletions after gravel <br />mining operations have ceased. If reclamation of the mine site will produce a permanent <br />water surface exposing groundwater to evaporation, an application for a plan for <br />augmentation must be filed with the Division 1 Water Court at least three (3) years prior <br />to the completion of mining to include, but not be limited to, long-term evaporation losses <br />and lagged depletions. If a lined pond results after reclamation, replacement of {agged <br />depletions shall continue until there is no longer an effect on stream flow. <br />