Laserfiche WebLink
t <br />~orado Division of Nine:als and.6eology • <br />ESTIHATIN6•FORM - BULLDOZER NORR •, <br />-------------------------------- <br />Task t: 5 Prep. by: SSS Task File Name: N165-5 <br />bate: 03/08J95 Permit I:H-81-165 Nine: Neglected Nine <br />Permit. Action: Sucessior~ of operator <br />Task Description: Regrade lower equipment storage pad <br />HOURLY EOUIPNENi CO51 <br />_____________________ Basic Machine: Cat. D6H Horsepower: 165 <br />blade Type: Seni-Unrversal """"" <br />Attachment. rl: ROPS Cab Shift Basis: 1/day <br />Attachment W2: 3-shank ripper """"" <br />Cost Breakdown <br />__"'""-""""" Utilization Y icode hkm) <br />Ownership cost/hi - 524.59 N/A <br />Operating d overhaul cost/hr- dotes = (22.63 100 <br />-ripper = 50.20 10 <br />Operator cost/hr - 521.58 NiA <br />Total egpt. unit cost%hr = (69.01 Total fleet. cost/hr: E69.01 <br />MATERIAL 9UANTITIES <br />Inttial swell Loose <br />Volume: 90.0 CCY Factor: 1.125 Volume: 101.3 LCY <br />Source of quantiry take-off: Assume 30' a 40' area graded to 2' depth <br />Sow ce of est. swell Factor: CAI Handbook <br />NOUP,LY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. Push distance: 50 ft. """""""""""" """ " <br /> ,..".'. . Operator.......... 0 .15 (avg.) <br />Unadjusted hourly Mat. consistency.. 0 .90 (Cat tbl) <br />doter production: 545 LCY/hr Donng method.....: 1 .00 (gen.; <br /> "" """ Visibility........ 1 .00 (avg.) <br />Material ronsistency : Joh efficiency....: O .R3 (1shJday) <br />Compacted fill or emt~anknent Transmission type. 1 .00 ( PS ) <br />"""""""""" """" "'"""' Grade adjust.ment.. 1 .00 (Cat tbl) <br />Avg. push gradient: O.OD : ,pos) Altitude adj. .... 0 .9R (Cat tbl) <br /> """`"" Nat.erial weight... 1. 00 (Cat tt~ll <br />dvg. site altitude: 10000 f[. Btade type........ 1 .00 (S or Ul <br />Notarial weight : 2300.OU It~iLCY Net. Job Correction 0 .55 <br />Mat. Desrr.: <br />GENERAL FILL Adjusted Unit Prod.: 298. 93 LCYIhr <br /> Adjus ted fleet Production: 298. 83 LCY/hr <br />JOB COST "" "" "' <br />Fleet site 1 Doterls) ioial Job Tine: 0. 34 Hours <br />Unit Cost 50.2,;1 iLC! Total Job Cost 523. 31 <br />