Laserfiche WebLink
~lorado Division of Hinerals and Geology • <br />ESTIMATING FORM - BULLDOZER VIORK <br />Task 1: 6 Prep. by: SSS Task file Hame: N165-6 <br />Date: 03/08/95 Permit J:N-81-165 Nine: Neglected Mine <br />i <br />Penit Artian: Sucession of operator <br />I Task Description: Regrade vat leach pad area <br />HOURLY' EOUIPNENT C9ST <br />-"---"--'---'---~~- Basic Machine: Cat D6H Hm sepower: 165 <br />Glade type: Semi-Universal """"" <br />Attachment pl: ROPS Cab Shift Basis: 1/day <br />Attachment 12: 3-shank ripper """"" <br />Cost Breakdown: <br />"""""""' Utilization i (rode h~km) <br />Ownership cost(}u 524.59 N%A <br />Operating d overhaul cost%hr dozer = 522.63 100 <br />-ripper = 50.20 10 <br />Operator Cost/hr 121.58 N/A <br />Total egpt. unit cost/hr = 569.01 Total fleet cost/hr: 569.01 <br />MATERIAL QUANTITIES <br />------------------- <br />------------------- <br />Initia] Swell Loose <br />Volume: 50.0 CCY Factor: 1.125 Volume: 63.0 LCY <br />Source of quantity take-off: Assume 25' r 30' area graded to 2' depth <br />Source of est. swat! factor: CAi Handbook <br />HOURLY PkODUCTION <br />____-___ ______;= Job Condition Correction Factors <br />Avg. push distance: 50 ft. """""""""""" """" <br /> """"' iperator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 ]Cat tbl) <br />dozer produc.t.ian: 54S tCYjhr Dazing method..... 1.00 (gen.] <br /> """"' Visibility........: 1.00 iav9~l <br />Material consistency: Job efficier~rY.... U.83 (lshjday) <br />Compacted fill or embankment Transmission type. 1.00 ( PS ) <br />"""""`"""""_""""""""` Grade adjustment.. 1.00 (Cat tbl! <br />Avg, push gradient: 0.00 Z Iposl Altitude adj. .... 0.98 (Cat tbl) <br /> ""`""` Naterial weight... 1.00 iCat t.bl) <br />i Avg. site altitude: 10000 f(. 81ade type........ 1.00 (S or U) <br />Materiai weight 2300.00 lbr'LDY Net Job Correction 0.55 <br />Hat. Desn .: ,........ ... ..,...,. <br />GENERAL FILL .. Adjusted Unit Prod.: 298.98 LCYjhr <br /> Adjusted Fleet Production: 298.9'? LCY/hr <br />JOB COST .,. "..,... <br />Fleet size ! Dozeris) iota] Job Time: 0.21 Hours <br />Unit Cost <br />. f0.23] <br />....... /LCY total Job Cost: <br />... 514.54 <br />........ <br />