My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27950
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:17 PM
Creation date
11/20/2007 8:41:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
3/8/1988
Doc Name
CDPS GENERAL PERMIT FOR COAL MINING FACILITIES SURFACE RUNOFF ONLY AUTHORIZATION TO DISCHARGE UNDER
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 8 <br />Permit No. COG-850000 <br />• <br />B. SFPLDENT LIMITATIONS AND MONITORING REQIIIREMENTS <br />3. Pootnotea (applicable to preceding pages) <br />a/ - The thirty (30) day average shall be determined by the arithmetic <br />mean of all samples collected during a thirty (30) consecutive-day <br />period. Samples shall not be used for more than one reporting <br />period. <br />b/ - The seven (7) day average shall be determined by the arithmetic <br />mean of all samples taken on separate days in a seven (7) <br />consecutive-day period. Samples shall not be used for more than <br />one reporting period. <br />c/ - This limitation shall be determined by a single sample or net of <br />samples ae required by Part I B. 2, Sample Type. <br />d/ - When the measurement frequency indicated ie quarterly, the samples <br />shall be collected during March, June, September and December, if <br />a continual discharge occurs. If the discharge is intermittent, <br />then samples shall be collected during the period that discharge <br />occurs. If the permittee, using the approved analytical methods, <br />monitors any parameter more frequently than required by this <br />• permit, then the results of such monitoring shall be included in <br />the calculation and reporting of the values required in the <br />Discharge Honitoriag Report Form or other forme as required by the <br />Division. Such increased frequency shall also be indicated. <br />e/ - Definitions of Sample 1y+pe <br />1. A "composite" sample, for monitoring requirements, is a <br />minimum of four (4) grab samples collected at equally spaced <br />two (2) hour intervals and proportioned according to flow. <br />2. A "grab" sample, for monitoring requirements, is a single "dip <br />and take" sample. <br />3. Aa "instantaneous" measurement, for monitoring requirements, <br />is a single reading, observation, or measurement performed on <br />site. <br />4. A "continuous" measurement, for flow monitoring requirements, <br />is a measurement obtained from an automatic recording device <br />which continually measures floii. <br />n <br />U <br />
The URL can be used to link to this page
Your browser does not support the video tag.