Laserfiche WebLink
PART I <br />Page 7 <br />Permit No. COG-850000 <br />l J <br />B. EFFLIIENT LIMITATIONS AND MONITORIIQG REQIIIBII~II+N7.5 <br />2. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified in Part I.B.1, <br />the permittee shall monitor all effluent parameters at the follo~ri.ng <br />frequencies. <br />(a) Active Mining <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Settleable Solids, ml/1 h/ Monthly Grab <br />011 and Grease, mg/1 Weekly Visual f/ <br />pH, s.u. Weekly Grab <br />Total Dissolved Solids, mg/1 $/* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br />• (b) Poet-Mining <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MGD Monthly Instantaneous <br /> or Continuous <br />Settleable Solids, ml/1 h/ Monthly Grab <br />011 and Grease, mg/1 Monthly Visual f/ <br />pN, s.u. Monthly Grab <br />Total Dissolved Solids, mg/1 $/* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br />* Total Dissolved Solids monitoring is required only for discharges to the <br />Colorado River Basin. See specific facility certification rationale to <br />determine whether TDS monitoring is 'required. <br />** Total phosphorus monitoring is required only for discharges to the Dillon <br />__ Reservoir drainage area (i.e., Ten Mile Creek, Snake River, Blue River, <br />all tributaries to the Dillon Reservoir). See specific facility <br />certification rationale to determine whether phosphorus monitoring is <br />required. <br />. See Part I.B.3. for footnotes <br />