Laserfiche WebLink
• EXHIBIT 7 <br />PRODUCTION AND COST/STATION <br /> <br /> <br />Section Earthwork <br />Volume <br />(LCY) <br />Haul Dist. <br />(FT) <br />Equipment <br />Used <br /> <br />LCY/HR <br /> <br />Hours <br />Unit Cost <br />($/HR) <br />Total <br />($) <br />-16+00 <br /> 13,704 1800 623B 240 57 108.30 $ 6,173 <br />-14+00 <br /> 52,593 1600 623B 253 208 108.30 22,526 <br />-12+00 <br /> 68,815 1600 623B 253 272 108.30 29,458 <br />-10+00 <br /> 55,556 1400 623B 280 198 108.30 21,443 <br />-8+00 <br /> 44,444 1200 623B 300 148 108.30 16,028 <br />-6+00 <br /> 25,926 1000 623B 323 80 108.30 8,664 <br />-4+00 <br /> 17,407 800 623B 370 47 108.30 5,090 <br /> 1,675 200 D9 686 2 123.92 248 <br />-2+00 <br /> 6,296 600 6238 390 16 108.30 1,733 <br />• 5,866 150 D9 876 7 123.92 867 <br />0+00 <br /> 8,379 150 D9 876 10 123.92 1,239 <br />2+00 <br /> 17,598 150 D9 876 20 123.92 2,478 <br />4+00 <br /> 28,073 150 D9 876 32 123.92 3,965 <br />6+00 <br /> 29,748 150 D9 876 34 123.92 4,213 <br />8+00 <br /> 11,732 150 D9 876 13 123.92 1,611 <br />10+00 <br /> 15,922 150 D9 876 18 123.92 2,231 <br />lz+oo <br />9,218 50 D9 1448 6 123.92 744 <br />A-A' <br />26,816 200 D9 686 39 123.92 4,844 <br />B-B' <br />8,380 400 D9 343 24 123.92 3,027 <br />448,148 $136,582 <br />Operating Factors: <br />D9: Operator 0.90 623B: 6% rolling resistance <br />Material 0.70 <br />• <br />Slot 1.20 <br />Job. Eff 0.84 <br />Grade 1.20 <br /> 116H (Revised 04/13/90) <br />