Laserfiche WebLink
r~,xr I <br />Page if of 19 <br />Permit No. ~-0032115 <br />8. MONTIORINC REQUIRF2~ST15 <br />1. Freauencv and Samale Type (contirn~ed) <br />(a) Outfalls 003, 006. 008. 010. 012 and 014 <br />Effluent Parameter Measurement Freouencg <br />Flow, MCD Weekly <br />Total Suspended Solids, mg/¢ Monthly <br />Total Iron, mg/¢ Monthly <br />Settleable Solids, mP/¢ Mondrly <br />Oil and Grease, mg/¢ Weekly <br />pli, s.u. Weekly <br />(b) Outfalls 001. 002 005 009. 011. 017. 015 and 016 <br />Effluent Parameter Measurement Freouencv <br />Flow, MGD <br />Weekly <br />Total Suspended Solids, mg/¢ Monthly <br />Tonal Iron. mg/¢ S(^-1`TL=-~fSL= SoI1d5 h~[.Monthly,~lppNpKY <br />Oil and Crease, mg/~ Weekly <br />111, s.u. Weekly <br />Lllrole F,ffluent Toxicity, Acute Qearterly <br />Sar~le Tvce <br />Instantaneous <br />or Continuous <br />Grab <br />Crab <br />Grab <br />Visual <br />Grab <br />Sale Type <br />Instantareous <br />or Continuous <br />Grab <br />v s~ua-`C.2A6 <br />Crab <br />GYab <br />Sampling by the pennittee for ca~liance witrr the monitoring requirements specified above shall <br />be performed at the following locations: disc}razge points 001, 002, 003, 005, 006, 008, 009, <br />010, 011, 012, 013, 014, 015 and 016, as shown in Figures 1, 2, 3, 4, 5 and 6. <br />Should a precipitation event or srrowirelt occur, the permittee shall submit proof in order for an <br />exemption to be claimed. Said proof shall be submitted as an attacfinent to the Discharge <br />Monitoring Report (fMR) for the appropriate period. See Section I.A.2. <br />(c) 011 and Crease }fonitorin¢ <br />For emery outfall with oil aid grease monitoring, in the event an oil sheen or floating oil is <br />observed, a grab sart~le shall be collected, analyzed, and reported on the appropriate DMR. In <br />addition, cotl-ective action shall be taken irmnedlately to mitigate the discharge of oil and <br />grease. A description of the corrective action taken should be included with the DMR. <br />2. Special Conditions - OutEall 005 <br />Uiscliarges a[ the flow measuring point for this outfall need only be sampled/measured when the <br />discharge is from the final sediment pond. <br />In addition, the pettnittee will be required to submit all data collected on the seep flow wlumes at <br />005 on an on-zoing basis to be submitted as a separate attaclment with the Cf4Ls. <br />Amendment 2 Issued 03/15/94 Effective 05.~- <br />Amendtrent 3 Issued e7/OF/4y Effective o/~1Y <br />See Part I.C. for Definitions. <br />