My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27806
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:11 PM
Creation date
11/20/2007 8:30:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
4/27/1999
Doc Name
INSPECTION FOR INACTIVATION REQUEST OF INDUSTRIAL WASTEWATER TREATMENT FACILITY
From
CDOH
To
MONTANA POWER CO
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> <br />Industrial Wastewater Facility <br />Inspection Report <br />APR 2 71999 <br />Division of Minerals 8 (ieoiog~ <br />SECTION A <br />NATIONAL DATA SYSTEM CODING <br />Trans Code CDPS/NPDES Date <br />N 5 COG-850040 04/13/99 <br />Fac Eval BI QA County <br />2 36 <br />SECTION B: FACILITY DATA <br />1. Legally Responsible Party: <br />Mailing Address: <br />Business Phone: <br />Emergency Phone: <br />Legal Representative: <br />Inap Type Inspector Fac Type <br />C S 2 <br />Operator Plant Class <br />n/a C <br />Basin Resources, Inc. - ~~olden Eagle <br />16 East Granite <br />Butte MT 59701 <br />(406)496-5188 <br />(406)496-5188 <br />Bob Gannon <br />2. Operating Company: Basin Resources, Inc. - Golden Eagle <br />Mailing Address: P.O. Box 162 <br />Weston CO 81091 <br />Business Phone: (719)868-2761 <br />Emergency Phone: (719)868-2761 <br />Local Facility Contact: Thompson, Ronald G. <br />3. Has any of this information changed since the last inspection? Y <br />4. County in which facility is located: Las Animas <br />5. Plant Products: mine closed and being reclaimed <br />Present Production Rate: n/a <br />Design Production Rate: 2,500,000 tons/year <br />Raw Materials: n/a <br />SECTION C: AREAS EVALUATED DURING INSPECTION <br />6. Briefly describe the process steps used in producing the product. <br />Include a process flow diagram and a discussion oY chemicals used at <br />the site and their final disposition. State the Yinal disposal oP <br />wastewater streams. <br />The mine has been closed and the site is being reclaimed. It <br />presently is in Phase I of the Division of Mineral and Geology's <br />reclamation process. When the mine was operational; bituminous <br />coal was brought to the surface from a 600-800 ft. deep <br />underground mine. The unwashed coal was then trucked off site to <br />the New Elk mine for further processing. <br />The mine site has been contoured and a cover crop pl.snted on the <br />disturbed areas. No discharge from the mine was noted during the <br />inspection and the reclaimed areas appeared in good condition. <br />Also, SEDCAD+ modeling of the site indicated that the vegetative <br />growth at the site was adequate to meet the settleable solids post <br />mining limitation of 0.5 mg/1. Regular field inspections <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.