Laserfiche WebLink
i Mr. Peter O'Conno~ <br />~~ <br />D. Reclamation Costs.' <br />TfLR 9/9/83 f~age 2 <br />1.5 ft of soil = 2420 yd3/ac. <br />Down hill haul-sandy loam-max. 350 foot haul 2 $0.45/yd3 =$1089.00 <br />seeding: 22.6 lb ~ 53.00= $67.80 + $50.00 labor = 117.80 <br />Misc grading, (~ $220.00/ac = 220.00 <br />Total cost/ acre $1426.80 <br />Say 1430 <br />Major= 8.5 x $1430= $12,155 <br />Moderate @ 50°o complete. 16 x $715= 11,440 <br />Minor. Possible reseed. 6 x 118 = 708 <br />Total realistic bond amount <br />$24,303 <br />E. Proof of legal right to enter. Enclosed is a copy of the <br />"Mining Lease" agreement between Jean Blue and 7.emlock and Son, <br />Inc. Legal right to access is stated in item 12, page 6 of the <br />agreement. This document should be considered confidential. <br />F. Enclosed is a copy of the receipts on the mailings to the <br />land owners and the proof of publication from the Glenwood Post. <br />Respectfully, <br />l ~ <br /><%~ <br />erome F. Gamba <br /> <br />~l:.s S:.;r: ~ .. <br />