Laserfiche WebLink
7 ay <br />CORN CONSTRUCTION CO. `~ <br />4 <br />P. O. Box 1290 PHONE 292.3380 <br />~n ~ <br />OFFICE & YARD <br />2868 FREEWAY EAST <br />Grand Junction, Colorado 81501 <br />February 28, 1477 <br />Mined Land Reclamation Board <br />1313 Sherman St. <br />723 Centennial Building <br />Denver. Colorado 80203 <br />~iU -j ~fl <br />_. ,_.__.: c..f, <br />,., <br />REFERENCE: North Delta Pit for Colorado Department of <br />Highways <br />Project o. F-050-1(7) <br />Dear Sir: <br />As provided for in Section 34-32-111 of House Bill <br />No. 1065, we herewith submit our application to mine <br />sand and gravel for the construction of Colorado <br />Department of Highways Project No. BRF-050-1(7). <br />The location of this highway project is approximately <br />8 miles west and north of Delta on State Highway 50. <br />The items required under 34-32-111 enclosed are as <br />follows: <br />1. MAP: <br />The map submitted was prepared by A & S Consultants, <br />Inc. of Montrose, Colorado. Outlined on the map are the <br />property lines which are described in the legal description. <br />Also, the eight acres which are affected by this <br />application are outlined. The access road is also shown. <br />The area shown in blue is the fifty foot dike that will <br />be built in conjunction with the mining and reclamation <br />operation. <br />2. APPLICATION FEE: <br />No application fee is enclosed as it is not required <br />per (7). This work is to fulfill a contract with the <br />Colorado Department of Highways. <br />3. RECLAP7ATION BOND: <br />A reclamation bond is included in the amount of <br />twenty thousand dollars ($2,500.00 per acre times 8 <br />acres). This bond is written by the Gulf Insurance <br />Company. <br />