Laserfiche WebLink
• TC plan sampling sites, parameters, and frequency <br />• <br /> <br />The TC plan has the following sampling requirements. <br />Station name Location Parameters Frequency <br /> Same as inactive <br />All NPDES mining monitoring Same as in active mining monitoring <br />outfalls vazious plan (pages 1-14 of plan <br /> Exhibit 29) <br /> Full suite as <br /> Wms Fk described for this Annually, between July 20 and <br />WF-1 . station in active August 30, during mine pumping, if <br /> upstream <br />mining monitoring <br />any. <br /> plan <br /> Full suite as <br /> Wms <br />Fork described for this <br />WF-2 . <br />downstream station in active Concurrent with WF-1 sample. <br /> mining monitoring <br /> plan <br /> Water level and field <br /> Wms. Fk. parameters as <br />AVF-5 alluvium described in active Concurrent with WF-1 sample. <br /> downstream mining monitoring <br /> plan. <br /> Water level of <br /> 7 North Bumped water at <br /> <br />#5 Mine sump <br />Angle wellbore location. <br />Quarterly <br /> wellbore ~~ elevation below <br /> pip elevation may <br /> be reported as such.) <br /> Middle Water level and field <br /> Sandstone <br /> <br />downgradient pazameters as <br />Well TR-7A <br />from No <br />5 described for this Annually <br /> . <br />and 6 Mine well in active mining <br /> <br />workings monitoring plan. <br />TR -3y <br />TRO 1-32 <br />D-2 June 21, 2001 <br />