My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64512
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:28 PM
Creation date
11/20/2007 8:26:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
7/24/2007
Section_Exhibit Name
Exhibit 77 Deer Creek Shaft Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company <br />West Elk IvTine <br />Deer Creek Shaft Project Plan <br />USFSICDMG-Agreed Seed Mix -Mountain Shrub Habitat Type <br />Species PLS (ib/acre) % Of Mia <br />Mountain bromegrass 3 14 <br />Prairie juuegrass 2 10 <br />Western wheatgrass 4 19 <br />Indian ricegrass 3 14 <br />Sandburj bluegrass 3 14 <br />Bluebunch wheatgrass 3 14 <br />Erigeron speciosus 1 (approximate) 5 <br />Coreopsis lanceolata 1 (approximate) 5 <br />Thermopsis montana I (approximate) 5 <br />Total 20 100 <br />• This seed mixture will be a minimum of 99 percent pure live seed <br />containing a maximmn of 1 percent weeds, none of which are noxious. <br />Seed will be distributed at specified pounds per acre. <br />• The shaft pad disturbed area will be fertilized (25-0-0, minimum NPK), <br />seeded with the approved seed mix, and mulched (certified weed-free <br />straw). <br />• The light-use roads will be restored as closely as possible to the <br />approximate original contour, re-seeded, fertilized, and mulched as above. <br />• The shaft pad and light-use road reclamation procedure outlined above <br />will apply only to those azeas newly dishubed fot this proposed project. <br />Existing roads will be left in a condition equal to or better than that <br />observed on MCC's entry into the azea or to the satisfaction of the USFS <br />representative. <br />Because of the raised bore or raise-boreJslash method of construction, any <br />coal recovered incidental to this project will be handled within the mine. <br />Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.