Laserfiche WebLink
111111 Illll IIIII IIIII IlIIII IIII Illilll 111 IIIII IIII IIII <br />3377669 04/07f20D6 04:45P Weld County, CO <br />3 of 11 R 56.00 D 0..00 Steve Moreno Clerk & Recorder <br />the Property as may be required pursuant to the drilling of Future Wells I[te locations for any new <br />flowlines and pipelines constructed on the Property pwsuant to the dtiiling of Future Wells shall be <br />munrally agreed upon by the patties, which agreement shall not be unreasonably withheld. <br />All flowlines and pipelines shall be located at a depth of approximately 48 inches from the <br />surface. the conshuction and bwying of additional flowlines, gathering lines and pipelines shall be at the <br />sole cost and expense of Operator or its gas purchaser. <br />Surface Owner shall maintain the tight to cross the easement with roads and other utilities At <br />such crossings, Surface Owner shall maintain a minimum distance of two (2) feet between the flowline or <br />pipeline and such road or utility. If' another utility will share Operator's easement and run parallel to <br />Operator's flowlines or pipelines, such other utility shall be placed at leas[ ten (10) feet fiom Operator's <br />flowlines or pipelines. <br />6. LOCATION CHANGES. <br />Surface Owner's present plans contemplate the Oil and Gas Operations Areas, Top Facilities, <br />access, flowline, gathering line and pipeline locations shown on Exhibit B. the patties acknowledge and <br />agree that different locations or relocations may be required by the governing agency or Surface Owner <br />Surface Owner shall have the right to relocate the location of Operator's Oil and Gas Operations Areas, <br />access, flowlines, gathering lines and pipelines on the Property fiom the locations shown on Exhibit B to <br />alternative locations if the following conditions are satisfied: <br />A. Surface Owner delivers a written notice of its demand for new location or relocation to <br />Operator that outlines in detail the proposed new location or relocation <br />B. The terms and conditions of the demand for new location of relocation are, fiom a <br />technical and engineering standpoint, reasonable and comply with all applicable codes, <br />rules, regulations and other laws, <br />C Any demand for relocation provides Operator with a reasonable time Name within which <br />to obtain the necessary governmental and other approvals and complete the relocation <br />D. Swface Owner agrees in its written notice to bear all costs of any such relocation. <br />E. the new location or relocation shall not unreasonably interfere with Operator's <br />operations on the Property. <br />NOTICE OF FIITURE OPERATIONS. <br />Operator shall provide at least fowteen days prior written notice to Surface Owner of any <br />operations in connection with the reworking, fracturing, deepening oc other operation on the Exiting Well <br />or any Futwe Wells; provided, however, that Operator shall provide at least 30 days prior written notice <br />to Surface Owner and/or any association formed by Swface Owner that is associated with the Property of <br />the drilling of any Future Wells.. Regardless of the foregoing notice requirements, Operator shall have <br />immediate access in the event of'an emergency <br />the notification of operations shall describe the following: <br />the approximate starting date for the proposed activity; <br />The proposed operations to be performed at the site; <br />