My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27746
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:08 PM
Creation date
11/20/2007 8:24:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Hydrology
Doc Name
REFERENCES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. FOOTNOTES <br />• <br />PART I <br />Page 3 of 19 <br />7. A '24 hour composite' sample is a combination of at Least eight <br />(8) sample aliquots of at least 100 mi11111ters, collected at <br />equally spaced intervals during the operating hours of a facility <br />over a twenty-four (24} hour period. For volatile pollutants, <br />aliquots must be combined la the laboratory immediately before <br />analysis. The composite moat be floe proportional; either the <br />time interval between each aliquot or the volume of each aliquot <br />moat be proportional to either the wastewater or effluent floe at <br />the time of sampling or the fowl wastewater or effluent flan <br />since the collection of the previous aliquot. Aliquots may be <br />collected manually or automatically. <br />f/ - In the event an oil sheen, or floating oil is observed, a grab sample <br />sha]1 be collected, analyzed, and reported on the appropriate DMR. <br />Ia addition, corrective action shall be taken immediately to mitigate <br />the discharge of ail and grease. A description of the corrective <br />action takes should be included with the DMR. <br />~/ - Where based on a minimum of 5 samples, the permittee demonstrates, to <br />the satisfaction of the Sister Quality Control Division, that the <br />level of total dissolved solids (SAS) is the effluent can be <br />calculated based upon the level of electrical conductivity, the <br />permittee may measure and report TDS is terms of electrical <br />conductivity. <br />h/ - TDS shall be sampled oa a monthly basis until siz samples nave been <br />analyzed. A report of 'Na Discharge" shall not be counted as one of <br />the siz samples. Thereafter, monitoring shall continue on a <br />quarterly basis. Following submittal of the initial siz sets of <br />monthly data, the Division shall determine whether the permittee is <br />required to submit a report addressing salt removal is accordance <br />with Regulations For Implemeatatian of the Colorado River Salinity <br />Standards Through the NPDES Permit Program, 3.10.0. If the salinity <br />report is required, the Division shall so advise the permittee by <br />letter and the report shall be submitted within 180 days. <br />i/ - This parameter is subject to 'Noncompliance Notification' <br />requirements of Part II.A.3.(b)(v) of this permit. <br />~/ -Procedure £or determining settleable solids is contained is 40 CFR <br />434,64. The method detection limit for measuring settleable solids <br />under this part shall be 0.4 ml/1. <br />'t/ -Should a precipitation event occur which is greater than the 10-year, <br />24-hour event, the permittee shall submit rain gauge or other <br />appropriate documentation in order for as esemptioa to he claimed. <br />In lieu of such documentation, limitations contained in Part <br />I.A.1.(b), shall apply. Documentation shall be reported as an <br />attachment co the Discharge Monitoring Report for the appropriate <br />period. <br />Code: i - 16 Date: 1-84, revised LO-88, revised 12-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.