Laserfiche WebLink
<br />seismograph will be installed at a Location to be approved by the Division, in <br />cooperation with the District. The seismograph will monitor each quarry <br />development and production blast. Seismograph records must be retained for at <br />least 3 years and be available for inspection by the Division on demand. <br />Continued access to the Waste Water Treatment Plant by the Operator is <br />necessary for compliance with this permit condition; if the owner(s) of the Waste <br />Water Treatment Plant denies the Operator's access at any reasonable time for the <br />purpose of seismographic monitoring, the requirement to comply with this pemtit <br />condition shall be re-evaluated by the Division through submittal of a technical <br />revision by the Operator. <br />DATED this / ~~ day of ~( , 2006. <br />FOR THE COLORADO MINED LAND RECLAMATION BOARD <br />~_ _ <br />' Flarry Ja ~ mtf',k, Chair, Mined Land <br />Reclamation Board <br />MMRR Board Order, M-2004-OG7 21 <br />2691 <br />