My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64389
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:21 PM
Creation date
11/20/2007 8:24:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Permit File
Doc Name
Bond Reduction 11/21/91
Section_Exhibit Name
Reclamation Project Binder
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flBCLANATION • SUNNA87 cont'd •eet 9 of 4 <br />8. P08TAL/SNAPS SBALING <br />Task No.; Task Descriptioo ; Cost (!1 <br />NIA . ; No portal or shaft sealing work required ; f0 <br />, <br />, <br />, <br />........:..................................................:............ <br />Subtotal (BI: f0 <br />L. DRILL BOLB/NONITOBINC NBLL SBALING <br />Task Na.; Task Description Cost (fl <br />H/A No uao. well sealing work incl. in this estivate !0 <br />, <br />Subtotal (LI: f0 <br />tl. tlISCBLLANB0U9 BSCLAMdTION TdSBS <br />Task No.; Task Description Cost (fl <br /> ~~ <br />H/A Structural Deaolitioa (total froa worksheet) !0 <br />4 ; Bevegetation (total froa worksheet) ; (6,640 <br />N/A Feaciag (total froa worksheet) f0 <br />5 ; tlobilization/Deaob. (total--froa worksheet! S2,4T2 <br />Subtotal (tll: 59,112 <br />TOTAL DIBBCT BBCLdtldTION COSTS (subtotals d through tll:. 519,078 <br />II. INDIBBCT COSTS <br />A. CONTBACTOB'9 OVB88BAD !PROFIT <br />Itea No.; Itea Description Coat (SI <br /> ' <br />1. Public Liability Insurance... I.SSOX of dir. ; 9296 <br />2. Contractor's Perforaance Bond 0.9TSX of dir. ; 1186 <br />3. Cootractor'e Profit........... 10.00X of dir. !1,908 <br />4. ; Job Superintendant Itotal froa worksheet) ; !2,623 <br />Suhtotal (dl: fS,013 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AtlOUNT (direct plus 0 d PI: f24,091 <br />------------ <br />B. CNLBD CONTRACT ADNINISTBATION B%PBNSBS <br />Itea No.; Itea Description Cost (fl <br />1. ; Contract Preparation Fees.,... 4,2SX of catr.; 31,024 <br />2. Project Ngut. S:penees (total froa worksheet!; !1,600 <br />........................................................................ <br />Subtotal (BI: !2,624 <br />TOTAL INDIBBCT fiBCLANATION COSTS (subtotals A through 81: !7,637 <br />TOTAL PRBFORNANCB BOND ANOUNT (direct plcs indirect costal: !26,715 <br /> <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.