|
flBCLANATIOl~T 3UtltlAfl9 cont'd ~heet 3 of 4
<br />B. BASTSNOBB - STBBAN CHANNBL 6BCONSTBUCTIOM
<br />Tast No.; feet Deacriptioa ; Coat (SI
<br />• N/A - ; No atreav chavvel reconstruction sort required ' ; f0
<br />, ,
<br />,
<br />,
<br />, ,
<br />,
<br />........:..................................................:............
<br />Subtotal (NI: f0
<br />------------
<br />I. BABTH40BB - SBDItlBNT POND/DIVBflSION DITCBICBBCB DAN BStlOYAL
<br />Task No.; Task Deacrition ; Cost (fl
<br />-.'
<br />N/A No pond reel. cork included in Chia estivate f0
<br />NIA ; No ditch rect. cork included in this estivate f0
<br />,
<br />,
<br />,
<br />,
<br />,
<br />,
<br />, ,
<br />, ,
<br />, ,
<br />, ,
<br />.
<br />,
<br />.
<br />, ,
<br />. .
<br />, ,
<br />,
<br />,
<br />.
<br />,
<br />.
<br />, ,
<br />,
<br />• ,
<br />Subtotal (I;: 30
<br />------------
<br />J. BdflTBYOflB -TOPSOIL/SUBSOIL BBPLACBNBNT
<br />fast No.; Task Deacriptioa ; Cost (fl
<br />1 - ; Pnah topsoil atoctpile off area to be regraded ; 32,170
<br />3 ;Spread stockpiled topsoil over regraded area ; !2,060
<br />,
<br />, ,
<br />, ,
<br />, ,
<br />,
<br />;
<br />,
<br />,
<br />, ,
<br />,
<br />,
<br />.
<br />,
<br />, ,
<br />,
<br />,
<br />.
<br />,
<br />,
<br />,
<br />Subtotal (J(: lA,189
<br />
|