Laserfiche WebLink
<br />Table 1 <br />Current and Projected Mine Water Flow and TDS Loadings <br />Powderhom Coal Company <br />Palisade, Colorado <br /> Average Flow Average TDS Concentration Average TDS Loading <br />Outfall (eom) (me/U (lb/dav) <br /> <br />Current Discharges <br />001 36 771 334 <br />004 102 1,836 2252 <br />Subtotal 138 2,586 <br />Projected Discharge <br />002 150 1,500 2j600 <br />Total All Discharges 288 6,186 <br />