<br />6-2 <br />' nonideal conditions in design variables. In addition, costs for mine water treatment and <br />' associated equipment assumed normal occurrences of fouling and mechanical problems. <br />Therefore, actual capital, O&M coat, and consequent 6-year present worth coat may escalate <br />' depending on results of these other evaluations. Each of these management alternatives are <br />technically feasible, however, they require substantial capital investment and O&M costa which <br />' may significantly impact the economic viability of PCC's total operation. <br />1 <br /> <br /> <br />1 <br />lJ <br />1 <br /> <br />1 <br /> <br />1 <br /> <br /> <br />1 <br /> <br />