Laserfiche WebLink
<br />EXHIBIT L <br />RECLAMATION COSTS <br />Grading and Contouring <br />30 hours at $90.00 <br /> <br />for operation and D-8 Cat ........$2700 <br />T'inal Distribution and spreading of topsoil <br />30 hours with S yard front <br />loader at $60.00 per hr. <br />for operator and machine $1800 <br />8 hours with motor <br />grader at $50.00 for 400 <br />operator and machine <br />Subtotal......$2700 <br />Seeding <br />seed <br />seeder and op- <br />erator for a day <br />$60.00 <br />$200.00 <br />Subtotal......$260 <br />,Projected Total reclamation costs..........$5660 <br />