Laserfiche WebLink
2.05.3(3) Mine FaciGNes <br />No mine facilities will remain after completion of reclamation with the exception of the paved haul <br />road that serves the Ewing Mesa # 1 Pit and has been approved for permanent retention. Sediment <br />control structures will be removed after a demonstration of erosion minimisation attainment as <br />provided for in the CDMG liability and bond release criteria. The following information is retained <br />for historical documentation and perspective and to demonstrate regulatory compliance where <br />applicable. <br />TR09, TRll (v1.0) 5-6 Revised 3/98, 8/02 <br />