My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64182
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:10 PM
Creation date
11/20/2007 8:18:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
10/9/2002
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Since the total disturbed area of the North Pit is 7.15 acres + approximately 1.2 acres of <br />downspoil to be covered with topsoil, the total area to be topsoiled at the North Pit is 8.35 <br />acres. <br />As shown in the calculations below, Topsoil Stockpile #2 contains 44,500 cubic yards of <br />topsoil. <br />Topsoil Stockpile # 2 Volume Report 07/14/2002 <br />Lower Left grid corner :2313475.60,1220621.28 <br />Upper right grid corner: 2313758.54,1221232.84 <br />X grid resolution: 160, Y grid resolution: 230 <br />X grid cell size : 1.77, Y grid cell size: 2.66 <br />Stockpile volume :1202871.3 ft3, 44550.8 yd3 <br />As 6,500 cubic yards of this volume will be retained for the haul road reclamation and <br />covering the portion of the Permanently Reclaimed SpoIls Area that will be redisturbed, <br />38,000 cubic yazds will be excavated and spread over the 8.35 acre North Pit azea and the <br />1.08 acres of haul road to be reclaimed. This yields an average calculated respread topsoil <br />thickness over the area (9.43 acres) of 2.5 feet. The operator commits to at least 1.0 feet <br />in all azeas. Since the total amount needed for cut/Sll balance at the North Pit is 62,008 cy, <br />the amount of regular fill brought to the Pit is 62008 yd3- 38000 yd3= 24008 yd3. <br />TROB, TRll (v1.0) 5-33 Revised 9/97, 08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.