Since the total disturbed area of the North Pit is 7.15 acres + approximately 1.2 acres of <br />downspoil to be covered with topsoil, the total area to be topsoiled at the North Pit is 8.35 <br />acres. <br />As shown in the calculations below, Topsoil Stockpile #2 contains 44,500 cubic yards of <br />topsoil. <br />Topsoil Stockpile # 2 Volume Report 07/14/2002 <br />Lower Left grid corner :2313475.60,1220621.28 <br />Upper right grid corner: 2313758.54,1221232.84 <br />X grid resolution: 160, Y grid resolution: 230 <br />X grid cell size : 1.77, Y grid cell size: 2.66 <br />Stockpile volume :1202871.3 ft3, 44550.8 yd3 <br />As 6,500 cubic yards of this volume will be retained for the haul road reclamation and <br />covering the portion of the Permanently Reclaimed SpoIls Area that will be redisturbed, <br />38,000 cubic yazds will be excavated and spread over the 8.35 acre North Pit azea and the <br />1.08 acres of haul road to be reclaimed. This yields an average calculated respread topsoil <br />thickness over the area (9.43 acres) of 2.5 feet. The operator commits to at least 1.0 feet <br />in all azeas. Since the total amount needed for cut/Sll balance at the North Pit is 62,008 cy, <br />the amount of regular fill brought to the Pit is 62008 yd3- 38000 yd3= 24008 yd3. <br />TROB, TRll (v1.0) 5-33 Revised 9/97, 08/02 <br />