My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64182
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:10 PM
Creation date
11/20/2007 8:18:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
10/9/2002
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Pit Backfill and Retopsoiling Calculations <br />The following calculations for cuts and fills were made by gridding the existing and final <br />surfaces in Survcadd. <br />North Pit Volume Report 07/14/2002 <br />Comparing GRID file: E:/ewingmesa/NORTHPITX.grd <br />and GRID file: E:/ewingmesa/NORTHPITF.grd <br />Grid corner locations: 2314564.29,1221080.62 to 2315317.93,1221914.64 <br />Grid resolution X: 300, Y: 300 Grid cell size X: 2.51, Y: 2.78 <br />Area in Cut :77827.5 ft2, 1.787 acres Area in Fill: 152838.0 ft2, 3.509 acres <br />Total inclusion area: 230665.5 ft2, 5.295 acres <br />Cut to Fill ratio: 0.20 <br />Average Cut Depth: 5.28 ft. <br />Cut (yd3)/ Area (acres): 2874.38 <br />Average Fill Depth: 13.64 ft. <br />Fill (yd3) /Area (acres): 14584.26 <br />Cut volume: 410963.21 ft3, 15220.86 yd3 Fill volume: 2085176.90 ft3, 77228.77 yd3 <br />Based on the above information, 15,220 cubic yards will be cut material from the existing <br />surface. Approximately 4,000 cubic yards of this amount will be cut from the downspoil <br />on the North Pit outslope by a lazge excavator. The remainder of the cut material is from <br />excess bench material on the outer segment of the North Pit bench that will be used to <br />balance the fill volume on the North Pit bench. With these assumptions, the following <br />apply: <br />Excavator Cut: 4000 yd3 <br />Cut/Fill at North Pit with dozer 15220-4000 = 11220 yd3 <br />Remaining balance that must be brought from lower stockpiles 77229 - 15221 = 62,008 <br />yd3 <br />TR08, TR1l (v1,0) 5-32 Revised 9/97, 08/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.