Laserfiche WebLink
TopsoIl StockpIle # 2. Further, Cazbon Junction Canyon will be reconstructed to flow through a <br />new permanent diversion. <br />Sediment Ponds <br />Only Sediment Pond # 2 will be used for the Cazbon Junction Mine. Surface runoff from the gravel <br />operations is directed to and retained in a sepazate sediment pond, which was designed and <br />constructed as part of the gravel operations. Sediment pond sizing, design, and operation is <br />explained in Appendices 5-2 and 5-9. <br />TR09, TRII (v1.0) 5-9 Revised 3/98, 8/02 <br />