My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27662
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:05 PM
Creation date
11/20/2007 8:17:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978052
IBM Index Class Name
Hydrology
Doc Date
11/28/2005
Doc Name
Combined Replacement Plan
From
OSE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECHARGE PROTOCOL <br />Division of Water Resources <br />Division One -Greeley <br />1. The purpose of a `recharge sfnxxure" as refarerwad in this document is to <br />introduce water to the river aNuvium that wiN result in accretions to a live stream. <br />For the purposes of this document, a recharge stnrcrirre does not include a weN <br />that is used to arifidaNy rectrarge a Denver Basin bedrock aquifer. With that <br />qualification, a red'targe structure is delirted as: <br />a. A section of ditch, the losses from which can be reasonably drarecterized <br />by an average SDF value. <br />b. A ports or group of ponds that receive water from the same delivery <br />location and pn reasonably be assigned a single SDF value. <br />2. A written notiNcatiorr for each recharge structure must be provided to the water <br /><:orrrrrdssiorrerend division engineer. Tire Wviskrrr of Water Resources wig <br />not acknowledge any recharge activity conducted either prior to our <br />knowledge of Its exlstenee or whk:h cannot be corroborated with data 6y <br />the water commlaslorrar. The ratNicadon rte~t include: <br />a. the section, township and range of the structure (STR). <br />b. the dlstarrc~es of fire structure from the sectiar Nnes. <br />c. if the diversion point for the recharge stnxdrrre is rat boated in the vicinity <br />of the recharge site, then also provide the STR and distances from <br />section Nees d the metered diversbn point. <br />d. for ditch strixxrires, identify the location of the diversion structure. ff the <br />ditch is divided into more than one recharge reach, explain taw the <br />volume diverted will be aNocated to fire various sections. <br />e. the maximum water surface area of the structure. <br />3. Upon reoei~Arrg written notification, the Divisia- of Water Resources will assign <br />the structure a WDID number. The WDID number is the identification number <br />that will be used for the administration of the stnrdure and must be included in all <br />cortesponderrce and accountng reports. (Any structure epecHlcaly IdsntiHed <br />by 8TR and distances from section INtes In a Water Court appllcagon for <br />water rights or plan for augmentation will be considered to have met the <br />wrkten notiAcation requlrementa. For ntrucWras that were conceptualy <br />Included In a deaeed plan for augmentation but were not physlealy <br />constructed at the time of the decree, a written rtotlfieation of the Intsrrt to <br />construct the structure must be provided.) <br />4. Any stnrcture that lntercx:pts groundwater must be permitted as a well and <br />included in a plan for augmentation ar substitute water soppy plan approved by <br />the State Engineer. The Division of Water ftesouroes strorrgy recarrrnertds <br />avoiding recharge sWctures that Mtercept groundwater, En order to simplify the <br />accounting process. <br />Recharge Protocd, Revs January 28.2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.