Laserfiche WebLink
<br />• <br />• <br />SENECA COAL COMPANY DOZER PRODUCTION <br />2000 RN01-YOAST MINE <br />DOZE BACK THREE SPOIL PILES DATE: 20-Feb-01 <br />SUMMARY SHEET <br />EQUIPMENT REQUIRED <br />-CATERPILLAR D11N DOZER <br />VOLUME TO BE MOVED <br />TOTAL VOLUME 404,320 LCY <br />DOZING PRODUCTION <br />DOZING DISTANCE 62 FT <br />GRADE -10 % 1.22 push gradient <br />BLADE TYPE U <br />PRODUCTION 3156 LCY/SCH HR <br />SLOT DOZING 1.2 <br />MATERIAL 0.9 <br />VISIBILITY 1 <br />ALTITUDE 0.93 <br />SPOIL FACTOR 1 <br />UTILIZATION FACTOR 0.83 <br />OPERATOR EFFICIENCY 0.75 <br />ADJ. PRODUCTIVITY 2407 LCY/SCH HR <br />DOZER FLEET COST TOTAL EQUIP. <br /> 8 LABOR UNIT TOTAL <br />EQUIPMENT UNITS COST COST <br />DOZER 1 $315.39 $315.39 /SCH HR <br />TOTAL COST <br />Hours Cost/Hour Total <br />166 $315.39 $52,970 <br />25-I-8 <br />Revised 02/01 <br />