Laserfiche WebLink
<br />SENECA COAL COMPANY <br />2000 RNO7-YOAST MINE <br />CONSTRUCT FINAL DRAINAGE CHANNEL <br />BACKFILL AND GRADING ACTIVITIES <br />DESCRIPTION: Lay Geotextile fabric, load and place riprap <br />Equipment: 992C Endloader, 2 laborers <br />• <br />Volume: Ditch L W D <br />YPM-1 3900 15 <br />YPM-2 <br />YPM-3 1700 15 <br />YPM-4 1200 15 <br />YPM-5 2300 10 <br />YPM-6 900 20 <br />YPM-7 1500 15 <br />YPM-8 300 15 <br />Total <br />Cost: Riprap - 4722 cy ~ <br />Geotextile 18889 sy <br />Total: <br /> <br /> <br />25-1-9 <br />Fabric (sy) RipRap (cy) <br />0. 75 6,500 1,625 <br /> NR <br />0. 75 2,833 708 <br />0. 75 2,000 500 <br />0. 75 2,556 639 <br />0. 75 2,000 500 <br />0. 75 2,500 625 <br />0. 75 500 125 <br /> 18,889 4,722 <br />$36 /cy = $170,000 <br />$1.50 / sy $28,333 <br />$198, 333 <br />Revised 11/00 <br />