Laserfiche WebLink
~~ <br />\_J <br />• <br />SENECA COAL COMPANY <br />2000 RN01-YOAST MINE <br />HAUL SURFACE MATERIAL (Haul Road) <br />SUMMARY SHEET <br />VOLUME TO BE MOVED <br />SCRAPER FLEET COST <br />EQUIPMENT <br />SCRAPER <br />14-H <br />WATER TRK <br />TOTAL COST <br />3 See FPC Worksheets <br />W(ft) D(ft) L(ft) <br />50 1 24,900 46,111 LCY <br />64,509 tons <br />TOTAL EQUIP. <br />8 LABOR UNIT TOTAL <br />UNITS COST COST <br />4 $273.27 $1,093.08 /SCH HR <br />1 $75.66 $75.66 /SCH HR <br />1 $58.52 $58.52 /SCH HR <br />Hours (3) Cost/Hour <br />98 $1,227.26 <br />25-1-19 <br />Total <br />$120,271 <br />Revised 02/01 <br />