My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE64137
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE64137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:08 PM
Creation date
11/20/2007 8:17:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
BOND COST WORKSHEETS
Section_Exhibit Name
TAB 25 ATTACHMENT 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />• <br />SENECA COAL COMPANY DOZER PRODUCTION Part 6 of 9 <br />2000 RNOt-YOAST MINE <br />DOZE PERM ROADS (GRADING TO BLEND) DATE: 20-Feb-01 <br />SUMMARY SHEET <br />EQUIPMENT REQUIRED <br />-CATERPILLAR D11N DOZER <br />VOLUME TO BE MOVED <br />W(ft) L(ft) Total <br />100 21,700 49.8 AC <br />DOZING PRODUCTION <br />SPEED 2 MPH <br />BLADE WIDTH 19 FT <br />NUMBER OF PASSES 2 PASSES <br />PRODUCTION 2.30 AC/HR <br />SLOT DOZING 1 <br />MATERIAL 0.9 <br />VISIBILITY 1 <br />ALTITUDE 0.93 <br />SPOIL FACTOR 0.8 <br />UTILIZATION FACTOR 0.83 <br />OPERATOR EFFICIENCY 0.75 <br />ADJ. PRODUCTIVITY 0.96 AC/SCH HR <br />DOZER FLEET COST TOTAL EQUIP. <br /> 8 LABOR UNIT TOTAL <br />EQUIPMENT UNITS COST COST <br />DOZER 1 $315.39 $315.39 /SCH HR <br />TOTAL COST <br />Hours Cost/Hour Total <br />52 $315.39 $16,367 <br />ZS-1-18 <br />Revised 02/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.