Laserfiche WebLink
<br />L <br />• <br />SENECA COAL COMPANY <br />2000 RN01-YOAST MINE <br />REVEGETATION OF MINE AREA <br />SUMMARY SHEET <br />Operation Acres CosUAc Total <br />1 Drill Seed Cover Crop 550 $72.37 $39,803.50 <br />2 Drill Seed Mix 1 521 $439.93 $229,203.53 <br />3 Drill Seed Mix 2 19 $512.42 $9,735.98 <br />4 Drill Seed Mix 3 10 $339.09 $3,390.90 <br />SBroadcastSeedMixl 13 $794.28 $10,325.64 <br />6 Broadcast Seed Mix 5 (shrubs) 5 $2,005.09 $10,025.45 <br />7 Shrubs/Tree Seedling Planting 30 $9,000.00 $270,000.00 <br />Acre Subtotal for 2-7 above: 598 <br />8 Hydro mulch 11 $1,050.00 $11,550.00 <br />9 Straw mulch 31 $250.00 $7,750.00 <br />TOTAL $591, 785.00 <br />Assume 10% failure (Drill Seed Mix 1,2,3 and cover crop) <br />Assume 50% failure (Broadcast Seed Mix 1 and 5) <br />Assume 85% failure (shrub/tree planing areas) <br />Fencing at 0.7565 per ft 15840 ft <br />TOTAL <br />$28,213.39 <br />$10,175.55 <br />$229,500.00 <br />$11,982.96 <br />$871,656.90 <br />Notes: <br />The area for broadcast seeding is a contingency for areas that cannot be conventionally drill seeded. <br />The hydro mulch and straw mulch are a contingency for areas requiring more intensive surface stabilization <br />25-1-12 <br />Revised 02/OL <br />