Laserfiche WebLink
• SENECA COAL COMPANY <br />2000 RN01-YOAST MINE <br />TOPSOIL BALANCE -Mine <br />SUMMARY SHEET <br />• <br />Stockpile Volume Amt. Spread Stations <br /> (Ac-ft) (ccy) (1) (tons) (Icy) (2) <br />A 23.3 37,591 47,327 45,616 Pond 010 <br />B 13 20,973 26,405 25,451 Shop Area <br />C 13.7 22,103 27,827 26,822 Road "B" & <br />H 53 85,506 107,653 103,762 Wadge Pit A <br />I 25 40,333 50,780 48,944 Wadge Pit A <br />K 59.9 96,638 121,668 117,271 WadgePitA <br />L 65 104,866 132,027 127,255 Wadge Pit A <br />M 105 169,400 213,274 205,566 Wadge Pit A <br />O 105 169,400 213,274 205,566 Wadge Pit A <br />P 105 169,400 213,274 205,566 Wadge Pit A <br />Q 105 169,400 213,274 205,566 Wadge Pit A <br />R 105 169,400 213,274 205,566 Wadge Pit A <br />TOTAL <br />777.9 1, 255,009 1, 580,057 1, 522, 954 <br />SCRAPER FLEET COST <br />EQUIPMENT <br />SCRAPER <br />14-H <br />WATER TRK <br />• <br />TOTAL COST <br /> TOTAL EQUIP. <br /> & LABOR UNIT TOTAL <br />UNITS COST COST <br />4 $273.27 $1,093.08 /SCH HR <br />1 $75.66 $75.66 /SCH HR <br />1 $58.52 $58.52 /SCH HR <br />Hours (3) Cost/Hour Total <br />1016 $1,227.26 $1,246,896 <br />1 Based on an in-place stockpile density of 2518 Ibs/cy <br />2 Based on a loose cy density of 2075 Ibs/cy <br />3 See FPC Worksheets <br />25-1-11 Revised 02/01 <br />