Laserfiche WebLink
~~ (~ CUS7 ESTIMATING PROCEDURES <br />1. Monilization and Demootlixa[ion <br />(lOt of Itemb 1 through 5) <br />2. Structural Deolition <br />(Actual Coats) <br />3. Beckfilling and Grading <br />(Actual Cubic Yerd Costal <br />~ 4. Replacing Topsoil <br />(AC[ual Cubic Yerd Coats) <br />5. Seeding, Per[ilizetlon, Mulching <br />(Actual Acreage Coate) <br />b. Contingencies <br />l10\ of Items 1 through 5) <br />7. Hard Coate <br />(Sub[otal of Items 1 through b) <br />8. Engineering Coat^ <br />(~ of Line 7, see Gcaph II-2) 5.5% <br />~'~9. Reclamntion Mnnngement and Adminlatcation <br />(~ of line 7, aee Graph II-3) 3% <br />10. Profit and Overhand <br />(~ of line 7, aec Gcaph II-l) 13.7% <br />TOTAL COST ESTIMATE POR BONDING PURPOSES <br /> <br />287,518 <br />249,500 <br />2 , 524 , 609 <br />Inc. Above <br />$ 213.200 <br />327,483 <br />3,602,310 <br />198,127 <br />108,069 <br />493,516 <br /># 4,402,022 <br />-121- <br />