My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63972
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:10:00 PM
Creation date
11/20/2007 8:13:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994005
IBM Index Class Name
Permit File
Doc Date
12/28/1994
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT: <br />"-------""""----- Total Ems. Fleet Sixe Heul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />Subtotals 50.00 f0.00 <br />sheet 2 of 2 <br />--------------------------- Yei ght Ownership Heul Rig Fleet Sixe Xaul Trip Return Trip DOT Permit <br />Non-ROadable Ems. Description (tans) Cost/hr Cost/hr (ra. hauled) Cost/hr Cost/hr Cost/ea <br />Subtotals f0.00 f0.00 f0.00 <br />Total Eop. Fleet Size Xaul Trip Return Trip <br />Roedeble Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals 50.00 f0.00 <br />EQUIPMENT HAUL DISTANCE d TIME <br />Nearest major city or town within project area region: Montrose <br />_________________ <br />___________ <br />______________ <br />Total one way travel distance = 73.0 miles. Average travel speed = 35.00 nph. <br />Job Time - Non Roadeble Equip.= 0.75 hours load Roadable Equip.= N/A hours load <br />0.37 hours haul 0.37 hours haul <br />0.75 hours unload N/A hours unload <br />0.37 hours return 0.37 hours return <br />JOB COST <br />Total Mob/Demob Cost = f2,047.09 <br />NOTE: Non-roadeble equipment (haul rig required to transport) mob/demob costs based an 2 round trips, each trip <br />cons istirp of a one-way loaded haul and a one-way eopty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig deperdirg on degree of oversize) ere also required for oversize <br />equipment haulirp, and Loading/unloading times mist be increased substantially for equipment which gust be <br />partially dismantled for transport end re-assembled et the job site. Casts for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.