Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br />_________________________________________ <br />ESTIMATING-FORM-- EQUIPMENT IIOBILI2ATION / DENOB ILI2ATION II p <br />j`JU_-~„c' pip-1., JLrd/~fer~t, <br />Task N... 6-P Prep. by RCO Fileiame..M005 6-P-- SQL -f"L-S~ at' ~ n~, . <br />____________ ________ _ C <br />Date.....-- 30-Dec-94 Permit N M-94-005 Mine......COlona Pit Aspndnent Am-001 lid _ <br />Permit Action........ Rec lametion, ircLudirg ditch diversion <br />Task Description..... Mob/demob eouipnient <br />NWRLY ERUI PNENT COST <br />NOTE - This is a list to select frea, rot a list of merdetory here to include. <br />Mob/Denob Eop. -Trxtor 6x4, 75,000 lb GVw, 375 HP, diesel powered <br />-Lt. Trailer 25 ton foldirp goosereck, drop deck <br />-Med. Trailer 50 tan foldirq gooseneck, drop deck <br />-XVy. Trailer : 120 Ton foldi np gooseneck, drop deck <br />-Pilot tar On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boon <br />-Fuel Truck : 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck bx4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GW, 175 HP, diesel powered <br />Last Update: "--------"_ _________________"__"_""___________ ______________ ______________ °________" <br />May, 1991 <br />""""""""""""-" Lt. Rip Med.Rig Nvy.R ig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = f26.78 529.16 f37.74 f1.39 519.89 56.02 (10.66 (6.70 <br />Operating Cost/hr = 523.23 f24.76 f29.92 (4.05 523.40 f16.19 520.71 f7.47 <br />operator Cost/hr = f20.54 520.54 f20.54 (19.81 520.86 519.97 519.97 f19.97 <br />xelper Cost/hr = 519.81 519.81 f19.81 (0.00 50.00 50.00 50.00 (0.00 <br />Total = f90.36 (94.27 (108.01 525.25 (64.15 542.18 551.34 534.14 <br />MOM-ROADABLE EW IPMENT: <br />"""""""'""""""------- weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Descri ptian (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr <br />________ Cost/ea <br />__________ <br />_______________________________ <br />Cat D7H w/ ripper ___________ <br />27.00 ___________________________________ <br />531.10 f94.27 1 ______________ <br />5125.37 _______ <br />594.27 <br />Cat 615C Scraper 26.00 (31.68 594.27 1 (125.95 594.27 <br />Seedirq and welching equipment 10.00 (20.00 590.36 1 f110.36 (90.36 <br />Trerchirg/pipe laying equipment 10.00 520.00 f90.36 1 f110.36 (90.36 <br />Subtotals f472.04 5369.26 50.00 <br />