My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO27579
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO27579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:00 PM
Creation date
11/20/2007 8:10:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
12/7/1992
Doc Name
PROCEDURES FOR REGULAR INSPECTION OF KING COAL MINE
From
DON R MAY PE
To
MLRD
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;. <br />III III I I III <br />999 <br />November 29, 1992 <br />Harry Ranney <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />Colorado Dept. of Natural Resources _ _ <br />1313 Sherman St. Room 215 , ~~C'~i-~~~~ ;,' <br />Denver CO 80203 <br />DEC 7 1991 <br />RE: Procedures for regular inspection of King Coal Mine. DlVlbiv~~~ ~" <br />triINERAL~ 8 ~cC~'?` ' <br />Dear Mr. Bonney, <br />As you requested during your last visit to the mine I will begin regular inspections of the <br />mine's waste pile and drainage system as required by state regulations. I have summarized <br />what I think are the regulations pertinent to inspection at the mine. Please review the <br />attached guidelines and let me know if I need to add or delete anything from these. I will <br />give a copy to Jim Delusio and ask for his cooperation in notifying me during the critical <br />construction stages and abiding by these guidelines. <br />I think it would be a good idea if you, Jim, others at the mine and I had a clew <br />understanding of when the inspections should take place and what should be inspected and <br />reported. I hope these guidelines will achieve this. <br />My fast inspection will be this month, December 1992. Subsequent inspections will be <br />made quarterly on 3/93, 6/93, 9/93 and again in December of 1993 and so on, or more <br />frequently as required by the construction schedule and as outlined in my guidelines. <br />Sincerely, _ <br />(./ ~ /l/J <br />Don R. May, P. . <br />Project Engineer <br />735 East 7th Ave. <br />Durango CO 81301 <br />385-7504 <br />copy: Caryl Helmin <br />Jim Delusio <br />Brad Gosche <br />
The URL can be used to link to this page
Your browser does not support the video tag.