Laserfiche WebLink
;. <br />III III I I III <br />999 <br />November 29, 1992 <br />Harry Ranney <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />Colorado Dept. of Natural Resources _ _ <br />1313 Sherman St. Room 215 , ~~C'~i-~~~~ ;,' <br />Denver CO 80203 <br />DEC 7 1991 <br />RE: Procedures for regular inspection of King Coal Mine. DlVlbiv~~~ ~" <br />triINERAL~ 8 ~cC~'?` ' <br />Dear Mr. Bonney, <br />As you requested during your last visit to the mine I will begin regular inspections of the <br />mine's waste pile and drainage system as required by state regulations. I have summarized <br />what I think are the regulations pertinent to inspection at the mine. Please review the <br />attached guidelines and let me know if I need to add or delete anything from these. I will <br />give a copy to Jim Delusio and ask for his cooperation in notifying me during the critical <br />construction stages and abiding by these guidelines. <br />I think it would be a good idea if you, Jim, others at the mine and I had a clew <br />understanding of when the inspections should take place and what should be inspected and <br />reported. I hope these guidelines will achieve this. <br />My fast inspection will be this month, December 1992. Subsequent inspections will be <br />made quarterly on 3/93, 6/93, 9/93 and again in December of 1993 and so on, or more <br />frequently as required by the construction schedule and as outlined in my guidelines. <br />Sincerely, _ <br />(./ ~ /l/J <br />Don R. May, P. . <br />Project Engineer <br />735 East 7th Ave. <br />Durango CO 81301 <br />385-7504 <br />copy: Caryl Helmin <br />Jim Delusio <br />Brad Gosche <br />