Laserfiche WebLink
<br />information can be found in the geotechnical engineering study submitted with <br />the technical revision for the 1-acre stormwater retention pond by letter dated <br />April 16, 1999. <br />(c) (i) Piceance Site soils parameters, including soil salvage and <br />reclamation characteristics, are listed in the 112 Permit Application, <br />Exhibit I, Tables I-1, I-2, and, I-3. Additional information can be found in <br />the geotechnical engineering study submitted with the technical revision <br />for the 1-acre stormwater retention pond by letter dated Aprii 16, 1999. <br />(ii) Piceance Site soil erosion characteristics and reclamation limitations <br />are given in the 112 Permit Application, Exhibit I, Tables I-1, I-2, and I-3. <br />(iii) Recommendations for soil amendments are included in the <br />Reclamation Plan, Section 5.1.2, Soil Reconstruction. <br />(18) (a) Mitigation measures to ensure preservation of critical and important <br />wildlife habitat are included in the Wildlife Mitigation Plan. <br />(b) Measures to prevent wildlife from coming into contact with toxic or acid- <br />forming materials are given in the Wildlife Mitigation Plan and Item 8 of the <br />Adequacy Response. <br />(19) Not applicable. American Soda will not generate and therefore will not dispose <br />of mine workings, tailings, or sludges. <br />A-7 <br />