Laserfiche WebLink
09/05/2000 11:38 9702496 - MONTROSE COUNTY LUD PAGE 05 <br />• <br />ooataemioenb will need b be Included in the Base Line Water Quality Studies <br />required in Condition precedent 6 below and in Conditions Subsequent 4 end S <br />below. As pert of said discussion, also consider the concerns and suggestions <br />provided by wilGam I.otah (Senior Consultant w/Wright Water Engineers, for <br />Beverly Stnesntd-Stewart) in his letter of August 7, 2000. The determination of <br />which comaminanb should be included in the Base Line Water Quality Studies shall <br />be those Heeded to inattre that the quality of all effected ground water and surface <br />water can be compared with any futon ground water and/or surface water quality <br />issues a' might relate to the operation of a gravel mine in the area. <br />6, provide a Water Quality Study to Montrose County and the State Department of <br />Health which establishes the base line ground water quality properties and the <br />aeaeonel tniaimum ground water depths for Phase I and the Stewart Property prior to <br />opening Phase I for gravel mining. A Water Quality Base Line Study for the water <br />wells (two) on the Stewart Property shell also be undertaken prior to opening Phase I <br />for gravel mining. <br />CONIXfION3 SLtBSEOt1~': <br />(to be omaplied with during the life of the project) <br />1. The Mitigetioa Standards identified in Section XII of the Zoning Resolution shall be <br />eufoncced by the Pit Operator at all times. <br />2. A11 Qavei truck tre~lc shall travel the easterly 2, l OOf feet of Redvale Road between <br />the approved driveway and Hwy 145 when accessing the Angie Pit. <br />3. Provide eoetas ttpgradp for the intersection of Redvale Road and Hwy 145 if and <br />when traffic volumes require such improvements in accordance with the State <br />Highway Access Code and complete the installation of such improvements within <br />two years of the identification of the treed. <br />4. Provide a Water Quality Study to Montrose County and the State Department of <br />Health which establishes the hero line ground water quality properties and the <br />seasonal minimtrm ground water depths for Phase II prior to opening Phase II for <br />gravel mining. <br />5. Provide a Water Quality Stttdy to Montrose County and the State Depamnent of <br />Heahh which eatsblishn the bax line ground water quality properties and the <br />serraoeal minimum ground water depths for Phase III prior to opening Phase III for <br />grovel mining. <br />6. Pnrlasnt to N. 6. d. (~, Montrose Coumy Zoning Resolution, the Special Use shall <br />be conduced is conformance with the following desirtn guidelines: <br />(y Dam and otAac pab shall not be permitted to interfere with livestock or the caro of <br />Iivptoolt on sgloiaio~ aRieuhural Inds and suitable end enforceable protective covenant or <br />deed raatrlctioea will be provided thenforc. <br />(b) Roads will M loeaasd a su}flcient distance back from property boundaries so that <br />nortrral raaintarance of attoh roads, including scow removal, will not damage boundary fences. <br />