Laserfiche WebLink
<br />Activity Quantity Units Unit Cost Cost <br />I. Equipment mobilization demobilization <br />The 36 pieces of equipment are portable and <br />would be removed by the operator. <br />1. Remove concrete pad for wash plant 74 yards $3/yard $222 <br />2. Remove concrete pad for asphalt plant 160 yards $3/yard $480 <br />3. Demolish and remove shop I LS $5,000 $5,000 <br />4. Remove concrete footings for office 20 yards $3/yard $60 <br />5. Remove spill control berm and liner I LS $1,500 $1,500 <br />Total of Disturbance Costs $418,458 <br />Contractor Mobilization (l0%) $41,846 <br />Overhead (I S%) $62,769 <br />Administration (5%) $20.923 <br />Total $543,995 <br />Disturbed acreage - 60 acres <br />Financial warranty per acre - $9,067 <br />