<br />r~ <br />EXHIBIT L -RECLAMATION COST <br />We have selected the phase of the mining that includes the largest area that will be disturbed atone <br />time to calculate the potential reclamation liability. This will occur during phase 3. <br />Activity Quantity Units Unit Cost Cost <br />A. Stripped overburden and topsoil- <br />approximately 29 acres of disturbance <br />1. Replace overburden 39,111 CY $.84 $32,853 <br />2. Replace 12" of topsoil 19,555 CY $.84 $16,426 <br />3. Seed and mulch l0 Acres $400 $4,000 <br />B. Road - to remain for future access <br />C. Processing area -equipment is ponable and <br />would be removed by the operator <br />I . Remove concrete base for scale 120 CY $65 $7,800 <br />2. Scarify ground 10 Acres $150 $1,500 <br />3. Spread 12" topsoil 16,200 CY $.34 $13,608 <br />4. Seed and mulch 10 Acres $400 $4,000 <br />D. Settling pond <br />I. Place overburden 5' on 1 acre 8.100 CY $.84 $6,804 <br />2. Place topsoil 12" on 1 acre 1,620 CY $.84 $1,360 <br />3. Seed and mulch 1 Acres $400 $400 <br />E. Phase 2 lake shore final grade seed & mulch <br />I. Finished Grading 21,000 CY $.84 <br />2. Replace topsoil - 12" on 3 acres 5.000 CY $.84 $17,640 <br />3. Seed and mulch 3 Acres $400 $4,200 <br /> $ I ,200 <br />F. Silt pond reclamation/wetland creation <br />1. Seed to specified wetland mix. 17 Acres $400 $6.800 <br />G. Plantings <br />I. Plant trees and shrubs I LS $60,000 $60,000 <br />H. 20% Slurry wall installation' (per DMG <br />20% bonding requirement] <br />1. Excava[ion, materials, labor <br />2. Pit dewatering costs 93,042 Face F[ $2.50 $232,605 <br />' assumes 10,338 liner feet, average depth 45' times 20% <br />