My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63585
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:42 PM
Creation date
11/20/2007 8:05:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000087
IBM Index Class Name
Permit File
Doc Date
9/14/2000
Doc Name
AGGREGATE INDUSTRIES INC MILLIKEN SITE REGULAR 112 ADEQUACY REVIEW M-2000-087
From
ROCKY MOUNTAIN CONSULTANTS INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01310 -CONSTRUCTION SCHEDULES <br />1.01 GENERAL <br />A. Prepare detailed schedule of all construction operations and procurement to be reviewed by the <br />Engineer prior to commencing conswction. <br />No work is to begin at the site until Engineer's acceptance of the Construction Progress Schedule <br />and Report of delivery of equipment and materials. <br />1.02 FORMAT AND SUBMISSIONS <br />A. Prepare construction and procurement schedules in a graphic format suitable for displaying <br />schedule and actual progress. <br />B. Submit two copies of each schedule to the Engineer for review. <br />The Engineer will return one copy to the Contractor with revisions suggested or necessary for <br />coordination of the Work with the needs of the Engineer or others. <br />1.03 CONTENT <br />A. Construction Progress Schedule <br />I. Show the complete Work sequence of construction by activity and location. <br />2. Show the dates for the beginning and completion of: <br />a. Slurry wall construction in maximum 10 working day increments. <br />b. Earthwork operations. <br />c. Testing. <br />3. Show projected percentage of completion for each item as of the firs[ day of the month. <br />B. Report of delivery of equipment and materials <br />I. Show delivery status of critical and major items of equipment and materials. <br />2. Include a schedule which includes the critical path for Shop Drawings, tests, and other <br />submittal requirements for equipment and materials. <br />1.04 PROGRESS REVISIONS <br />A. Submit revised schedules and reports when changes are foreseen or when required by the <br />Engineer. <br />B. Show changes occurring since previous submission. <br />I. Actual progress of each item to date. <br />2. Revised projections of progress and completion. <br />01/99 Section 013 ]0 - Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.