Laserfiche WebLink
• • <br /> 8 <br />I' <br /> EXHIBIT D <br /> RECLAMATION PLAN <br /> : <br /> Attached is the Reclamation Plan prepared by the Baca <br /> County Soil Conservation Service. This plan will be <br /> followed by the operator. <br />--~- <br />' The estimated costs to reclaim the mining site are: <br />' Backfilling: <br />' 1 loader - 12 hours $ 420.00 <br /> 1 dozer - 12 hours 420.00 <br />' 2 men - 12 hours <br />3 trucks - 10 hours 196.00 <br />750.00 <br /> 3 men - 10 hours 195.00 <br />' Top Soil Application: <br /> 1 loader - 10 hours '350.00 <br />' 1 man - l0 hours 65.00 <br /> Seeding: <br />' 1 tractor and <br /> grass drill - 4 hours 100.00 <br /> 1 man - 4 hours 26.00 <br />' Mulching: <br />' 2 trucks - 10 hours <br />1 loader - 10 hours 250.00 <br />350.00 <br /> 3 men - 10 hours 195.00 <br />' Moving equipment from Two Buttes: <br /> 1 semi and lowboy <br /> trailer - 2 1J2 hours 87.50 <br />' 1 man - 2 1/2 hours 16.25 <br /> 1 loader to site - 1/4 26.25 <br /> 1 dozer to site - 1/4 26.25 <br />' 1 loader to top soil <br /> site - 1 lj2 hours 52.50 <br />' Grass seed 100.00 <br /> TOTAL $ 3,625.75 <br />' + 15.8% 572.86 <br /> GRAND TOTAL $ 4,198.61 <br />' <br /> <br />