Laserfiche WebLink
The project is feasible and probably economically feasible. We need to discuss how <br />much you will need designed and built by us beyond doing the bridges. We haven't <br />looked at the standazd overland requirements, transfer points and drive requirements. I <br />understand that Lafazge has an inventory of overland components and we can assist in <br />incorporating what is in stock with what needs to be designed and built if you need that <br />done. <br />I believe the next step for us to accomplish would be to work up a design-build quote on <br />what we have proposed or on alternative proposals if you have any. <br />We aze assuming permitting is in place or will be in place for the project. If you need <br />assistance in that regazd, let me know. <br />If you have any questions or would like to meet and review what we have come up with, <br />give me a call. <br />Sincerely, <br />erry oh~ <br />