My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63501
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:38 PM
Creation date
11/20/2007 8:02:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006018
IBM Index Class Name
PERMIT FILE
Doc Date
9/11/2006
Doc Name
DMG Response to 2nd Adequacy Letter dated 05/25/06
From
Gustavson Associates
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DMDE CONSTRUCTORS <br />April 7, 2006 <br />Lafazge North America <br />Western U.S. Region <br />10170 Church Ranch Way, Suite 200 <br />Westminster, CO 80021 <br />Attention: Mazk A. Vigil <br />RECEIVED <br />SEP 1 12006 <br />Dlvlslon of Reclamation, <br />Mining and Safety <br />Enclosed please find the following: <br />1) A copy of a survey showing proposed suspension bridge and overland <br />conveyor. <br />2) Site assessment and recommendations by J&T Consulting. <br />I believe that the original scope of work anticipated for us was a suspension bridge and <br />two trusses that would span a relatively short distance. An examination of the site <br />indicates that you may want to change the scope of the work you what us to do. <br />The anticipated placement and span estimated for crossing the main channel of the river <br />was verified and the bridge can be designed for 250 feet. <br />The ground from station 0+00 to 10+00 is all in flood plain. I believe that a conveyor <br />operating over this azea should be elevated truss with a catwalk, either one side or two. <br />Minimal environmental impact could be achieved by placing footers on top of the ground <br />and anchoring the conveyor with cable stays. I would anticipate raising a conveyor about <br />eight feet above ground level to traverse this area. <br />The azea from station 12+00 to 15+00 crosses an island that also is in flood plain and it <br />should be traversed with elevated conveyor also. <br />The north channel of the river is approximately 150 feet bank to bank. It would take a <br />substantial truss to span that azea and I am recommending a suspension bridge as the <br />least-cost approach to spanning the channel. <br />The necessity of crossing some water and fairly rough terrain probably precludes getting <br />anything lazger than a 75 ton crane into the area. Therefore, we will need to design <br />relatively light platforms with more vertical cable drops on these bridges. Further, we <br />will need to plan on some difficulty with getting concrete placed on the island. <br />PO BOX 438 <br />BERTHOUD, COLORADO 80513 <br />TELEPHONE: (970) 532-3761 <br />
The URL can be used to link to this page
Your browser does not support the video tag.