Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br /> Agenry or organization name :OMG <br />Task # : 066 State :Colorado PermiVob # : M-1976-027 <br />Date : 10278000 County : La PIaIa Abbreviation : none <br />User: SSS Sile: Craig Pit Filename:M027-066 <br /> <br />Permit or other job action : Technical Revision No. 2 <br /> Task description : R%p 'f$ aCR oleo p/%O! f0 fOpSO%/ !gip/aCemenf <br /> <br />HOURLY E QUIPMENT COST Basic machine :Car DBN (1996) ~ Horsepower : 285 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shilt basis : 1 per tlay <br /> Attachment no. 2 : 3•shank dpper <br /> Util2ation % Cosl data source : (CRG) <br /> Cost Breakdovm : Ovmership cosVhour: E41. f0 NA <br /> Operating cost/hour : E55.64 100 <br /> Ripper op. cost hour : E6.94 100 <br /> Operator cost/hour: E23. /2 NA <br /> Total unit cost/hour : 4126.80 Total fleet cosghr : $126.80 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Alea <br />Seismic <br />method : NA NA Load factor : NA Bank volume : NA BCY <br />Area <br />method : 15.00 Acres Rip depth (fl): 1.00 volume : 24,200 BCY or CCY <br /> <br /> Source of qua ntity take-og : 15 disfurbetl acres to be fopsoiletl <br /> <br /> Source of material load lector : NA <br /> <br />HOURLY PRODUCTION <br /> Seismic method : Material seismic velocity : NA leel per second <br /> Unadjusted hourly production : NA BCV or CCY/hr <br /> Area method : Average ripping depth per pass : 1.00 feet <br /> Average ripping vndth per pass : 7.08 legit <br /> Average ripping length per pass : 500.00 feet <br /> Average velocity of machine : 88.00 legit per minute <br /> Average machine maneuver lime /pass : 0.25 minutes <br /> Hcudy production per unit area : O.B22 acres par hour <br /> Unadjusted hourly production : 1,326.18 BCY or CCY/hr <br /> Correction factors : Unadjusted hourly production : 1,326.18 BCY or CCY/hr <br /> Site altitude : 6,720 feet <br /> Altitude adjustment : 1.00 (Caf HB) <br /> Job eflicienry (actor: 0.83 (15hiNdayJ <br /> Net job cartection: O.B3 multiplier <br /> Adjusted hourly unit production : 1,100.73 BCY or CCV/hr <br /> Adjusted hourly fleet production : 1,100. ]3 BCY ar CCY/hr <br />JOB TIME AND COST <br /> Fleet size : 1 Dozers) Total job time : 21.99 Hours <br /> Unit cost : E0.115 /LCY Total job cost: $2,788 <br />