My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63456
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:35 PM
Creation date
11/20/2007 8:01:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
Permit File
Doc Date
11/1/2000
Doc Name
CRAIG PIT PN M-76-027 TR 2 RECLAMATION COST ESTIMATE & ADDITIONAL ADEQUACY COMMENTS
From
DMG
To
NIELSONS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estjmatina Software <br />SCRAPER-ONLY WORK <br />PROJECT IDENTIFICATION <br />Agenry or organ¢atian name : DMG <br />Task K : OIa Stale :Colorado Permit/joh %: M-1976-027 <br />Date : 7027/1000 County : La Plara Abbreviation :none <br />User: SSS Site: Craig Pit Filename:M027-07a <br />Permit or other job action :Technical Revision No. 2 <br />Task deudption :Replace Topsoil on Disturbed Areas Except Reclaimed Processing/Stockpile <br />HOURLY EQUIPMENT COST) <br />Model :Cat 633E (1996) Shin basis : 1 per tlay <br />Cost Breakdown : Joh utilization Yo Horsepower : 475 <br />Ownership cosVhour : Y65.79 NA <br />Operating cosVhour : E705.15 100 Weight (UST) : 56.00 <br />Operator cosVhour : $23.30 NA Cost data source : (CRG/ <br />Total unit cosUhour : Ef94.25 Telal0eel cosUhour: $194.25 <br />MATERIAL QUANTITIES <br />Initial Swell Leose <br />volume: 12,100 LCY factor: NA volume: 12,100 LCY <br />Source of quantity lake-oH :Assume 15 ac. Covered w/ 5 R. o/Topsoil <br />Source of estimated swell lador : NA <br />HOURLY PRODUCTION <br />Hauling CaoaciN <br />Scraper Payload (weight) basis <br />Material weight: 2,100 pounds <br />Material description <br />Earth -Loam <br />Rated payload : 82,000 pounds <br />Payload capacity: 39.05 LCY <br />Bowl (volume) Basis <br />Struck volume <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />Cvde Time (load + haul + spread + returnl <br />Travel lima <br />Roble j Distance ffeetl Grade (%1 <br />34.00 LCY <br />34.00 LCY <br />34.00 Lcv -'• <br />Loading time: 0.90 minutes <br />Maneuver and spreading time : 0.70 minutes <br />loading time per pair on push-pull motlels <br />Return :j 350 7.1 5.0 12.1 89Z 0.52 minutes <br />•• Vavel dme adjusted for acceleROOn and deceleration a[ load and dump points <br />Job Condition Correction Fagors <br />Site altitude (feel) : 6,720 <br />Altitude adjustment factor : 0.96 <br />Job efrcienry lector : 0.83 <br />Net job correction lector : 0. BO <br />JOB TIME AND 0057 <br />Fleet size: / Scraper(s) <br />Total cycle time : 2.44 minutes <br /> <br />Adiusted Hourly Production <br /> <br />Unadjusted unit production : 835.12 LCYMour'"' <br />Adjusted unit production : 665.43 LCYMour <br />Adjusted Oeet production : 885.43 LCYMour <br />2 times wlume on push-pull models <br />Telal job lime: 18.18 Hours <br />Unit cost : 50.292 /LCY Total job cost : 53,532 <br />
The URL can be used to link to this page
Your browser does not support the video tag.