My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE63437
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE63437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:09:33 PM
Creation date
11/20/2007 8:00:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522700
IBM Index Class Name
Permit File
Doc Date
9/16/2005
Doc Name
Cost Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X03 <br />Date : 09/16/2005 <br />User : JRS <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2005-227-00 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to Three Driil Pads <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,000 <br />State :Colorado Permiujob# : B/G ELK PROPERTY <br />County : Routt Abbreviation :none <br />Site :Big Elk Property Filename :BRTY--X03 <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />BCY <br />Swell <br />factor <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> <br /> <br />$51.01 Data source : (CRG) <br />Utilization <br />NA <br />$93.55 100 <br />$0.00 0 <br />$31.78 NA <br />$176.34 Total fleet cosUhour : 5176.34 <br />Loose <br />1.250 volume : 6,250 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Drv oacked <br />JOB TIME AND COS7 <br />Fleet size : 1 Dozers) <br />Unit cost : $0.368 /LCY <br />Adjusted unit production : 479.16 LCY/hr <br />Adjusted fleet production : 479.16 LCY/hr <br />Total job time : 13.04 Hours <br />Total job cost : $2,300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.