Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : X02 <br />Date : 09/16/2005 <br />User: JRS <br />State :Colorado <br />County :Roux <br />Site :Big Elk Property <br />Permitfjob# :BIG ELK PROPERTY <br />Abbreviation :none <br />Filename : BRTY-X02 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Notice of Intent X-2005-227-00 <br />Task description : Regrade Three Drill Pads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachmentno.2:3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br />OperatingcosUhour : $93.55 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosVhour : $31.78 NA <br />Total unit cosUhour : $176.34 Total fleet cost hour : $176.34 <br /><:; <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 BCY factor : 1.250 volume : 6,250 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION ;: <br />Job Condition Correction Factors <br />Source <br />Average push distance: 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill orembankment <br />Average push gradient : 5.00 % (1 <br />Average site altitude : 7, 700 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock. 50% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient: 0.40 <br />Altitude : 0.95 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.31 <br />Adjusted unit production : 379.20 LCY/hr <br />Adjusted fleet production : 379.20 LCY/hr <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 16.48 Hours <br />Unit cost : $0.465 /LCY Total job cost : $2,907 <br />