Laserfiche WebLink
CIRCES Cost Estimating Software <br />sheet 1 of 2 <br />Agency or organization name :ORMS <br />Task # : 05a State :Colorado PermiUjob # : M-2007-058 <br />Date : 10/23/2007 County :Moffat Abbreviation :none <br />User: THM Site :Sheehan Pit Filename :M058-05a <br /> <br />Permit or otherjob action : Final Reclamation Costs Estimate <br />Task description : Secondary seeding mobilization <br /> <br />EQUIPMENTTRANSPORT RIG COST ~ Shiftbasis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd hall, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br />OperatingcosUhour: $44.38 $46.13 $50.07 <br />Operator cosUhour : $27.66 $27.66 $27.66 <br />HelpercosUhour: $0.00 $25.39 $25.39 <br />Total Unit CosUhour: $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Relum Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Reveg. Tractor 10.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $98.67 $88.67 $0.00 <br />